info (at) bernstein-co (dot) com

CONSULTANT IN A LARGE INFRASTRUCTURE PROJECT

Bernstein is consulting one of the potential participants in the tender for the development of the Gas Interconnector Greece-Bulgaria (IGB Pipeline). 
The IGB pipeline will provide a direct link between the national natural gas systems of Greece and Bulgaria with an Entry Point near Komotini and an Exit Point in the vicinity of Stara Zagora. 
The IGB Pipeline will therefore act as a strategic gas transportation infrastructure providing diversification of gas supply to the Bulgarian and South East Europe gas market and supply security to Greece. 
The capacity of the new high-pressure pipeline is to be 3 to 5 billion m3/year with reverse flow capability, with an overall length of approx. 182 km.